Permit Description |
Download (PDF) |
Fee |
Application for new construction, additions, remodels, pools, hot tubs, decks, etc. |
|
varies
Minimum fee $100 |
Application to tear down an existing house |
|
$250 - $600 |
Application to move a house, into, out of and within the Town of Duck |
|
$250 - $1000 |
Application for individual, licensed trade work; i.e. electrical meter change-out/upgrade, HVAC replacement, plumbing or gas replacement. Work to be performed as subcontractor - see trade release forms below. |
|
varies
Minimum fee $100 |
Application for any man-made disturbance in a floodplain (required with submission of all Building Permit Applications if the property is located within a flood zone) |
|
$25-$100 |
New development requires planning for vegetation. A vegetation management plan showing what vegetation is to be retained on the lot and what is to be replanted must be provided prior to approval of a building permit or land disturbance permit. |
|
none |
Property Owner acknowledgement that the Town of Duck does not enforce restrictive covenants (required with submission of all Building Permit Applications) |
|
none |
Affidavit of Workers' Compensation Coverage (required from the Agent or General Contractor with submission of all Building Permit Applications) |
|
none |
Owner Authorization for projects with construction cost of $30,000 or less (required from Owner and Agent with submission of Building Permit Application) |
|
none |
Property Owner certification for nonrental parking deferral; allows for the deferral of parking spaces provided the property is not in a rental program, and provided a survey is submitted showing the parking requirements can be met if the property converts to a rental or is sold. This certification and approved survey must be filed with the Register of Deeds.
|
|
none |
Application for authorization of temporary electrical connection prior to issuance of a Certificate of Occupancy (several requirements must be met and an inspection performed prior to release of power) |
|
$300-$400 |
Appendix B - Building Code Summary for All Commercial Projects. This form is required to be completed and submitted either on the building plans or separately with any permit application involving commercial projects
|
|
assessed with building permit |
V zone Certification. This form is required for all development that occurs in High Velocity (v) Flood Zones. This form needs to be completed by a licensed North Carolina engineer or architect. |
|
n/a |