Construction to Resume on Monday, January 3, 2011 on Duck Road (NC 12) Storm Water Project

Work on the NC 12 (Duck Road) Storm Water Project will begin again on Monday, January, 3, 2011 with the removal of the multi-use path on the east side. The path is scheduled to be closed during January and February 2011. Remember, delays are possible when travelling through Duck during the project period.